Bathroom Renovation and Installation for Homes Across Essex

A well planned bathroom renovation can completely change how your home feels. We help you shape the design, choose the right layout and select fixtures that suit your style and budget. Our team handle every part of the installation, from carpentry and dry lining to tiling, plumbing and final finishing, creating a bathroom that is built to last and tailored to how you live.

Get a Quote
Plumbers Esx are 5 star rated plumbers on Google
A newly renovated bathroom with modern fixtures and clean tiling, showcasing professional bathroom renovation work carried out in Essex.
A newly finished bathroom showing modern design, quality tiling and professional renovation work carried out in Essex.
  • Fully qualified plumbing and heating engineers with extensive bathroom renovation experience

  • Experts in layout planning, first fix and second fix installation

  • Compliant with current building regulations and industry standards

  • Reliable, tidy workmanship that helps your project run smoothly

  • Covering Chelmsford, Colchester, Southend, Basildon and towns all across Essex

Why Choose Us for Your Bathroom Renovation?

Bathroom DESIGN AND Renovation

Planning and Layout Design

Every renovation starts with understanding how the space will work. We look at the layout, water pressure, existing pipework and the fixtures you want, then plan a bathroom that feels comfortable to use and straightforward to maintain. We make sure the design fits current regulations and works with modern heating and hot water systems.

First Fix Work

Once the room is stripped back, we install all the hidden pipework for hot and cold water, waste, heating and ventilation. Routes are planned carefully so they are tidy, accessible and reliable long term. This stage sets the foundation for everything that follows, so accuracy really matters.

Preparation and Coordination

Before work begins on the installation phase, we check access, timelines and any specific requirements with you or your builder. This avoids disruption and means the room is ready for each step of the renovation.

Removal of the Existing Bathroom

Before any new work begins, we carefully remove the old bathroom. This includes taking out the sanitaryware, lifting tiles, exposing pipework and clearing the space so we can assess the structure properly. Working this way helps avoid hidden surprises later and gives us a clean, accurate base for the new installation.

Boilers, Cylinders and Hot Water Performance

A bathroom is only as good as the hot water system behind it. We install and upgrade boilers, unvented cylinders, manifolds and heating controls to match how the home is used. Whether the property runs on gas, oil or a renewable system, all work is carried out by Gas Safe or OFTEC registered engineers.

Second Fix Installation

Every system is carefully tested, balanced and commissioned to meet building regulations and provide reliable performance from day one. We complete all required documentation and ensure everything is fully ready for handover.

Get a Quote

We are 5 Star Rated on Google. Homeowners Trust Plumbers.ESX

We had Plumbers.ESX in for our new build house, amazing standard of work - installing the whole of the heating system/gas works (including the underfloor) and all of the bathrooms. Really reliable guys!

⭐⭐⭐⭐⭐

Curt - Google Reviews

Can’t recommend Plumbers.ESX more… fabulous new bathroom after a complete rip out. They were flexible and supportive when we encountered a few hiccups. So pleased with the result and finish, they will be busy as I have passed on their number to everyone I know!

⭐⭐⭐⭐⭐

Vittoria - Google Reviews

Connor replaced our old boiler and we couldn’t be happier with the overall service and experience that they provided! Made the process painless and the new boiler works perfectly. Would highly recommend and would definitely use again for other plumbing services.

⭐⭐⭐⭐⭐

Olivia - Google Reviews

Get a Quote

Frequently Asked Questions

How long does a bathroom renovation usually take?

Most full bathroom renovations take between one and three weeks, depending on the size of the room, how much plumbing needs altering and whether the layout is changing. We give a clear timeline before work starts so you know exactly what to expect.

Do you remove the old bathroom before installing the new one?

Yes. We handle the complete strip out, including removing tiles, sanitaryware and old pipework where required. This gives us a clean base to work from and helps avoid issues later in the project.

Can you help with the bathroom design?

We guide you through layout choices, fixtures, heating options and practical considerations like storage and lighting. You keep control of the look and style while we make sure everything will work safely and efficiently.


Can I keep the same layout to save money?

You can, and it often reduces cost and disruption. If you want a new layout, we will explain what is involved so you can make an informed decision.


Do you install all the trades needed for a new bathroom?

Yes. We take care of plumbing, heating, carpentry, tiling, dry lining, mastic work and any adjustments needed for the room to be finished properly.


Will my current boiler or cylinder cope with a new bathroom?

Sometimes, yes, but larger showers or multiple bathrooms can need better hot water performance. We assess your system during planning and explain if upgrades are recommended.


Do I need an unvented cylinder for good shower pressure?

Not always. Good pressure can come from several systems, including combi boilers and boosted setups. We’ll advise what suits your home so the shower performs as you expect.


How much does a bathroom renovation cost?

Costs vary depending on size, layout changes, tile choice and the fixtures you select. We provide a clear quotation once we know the scope, with no hidden extras.


Do you work with existing builders or interior designers?

Yes, we regularly coordinate with builders, decorators and designers to keep the project running smoothly and minimise delays.


Can I still use my bathroom during the renovation?

Usually not, especially once the room is stripped out. Many customers choose to renovate one bathroom at a time or use temporary arrangements. We will always discuss this before work begins.